BAPEX readies to cap Inani gas well, burning for 30 days

Cox's Bazar Correspondent
Published: 28 November 2026, 6:01 PM

The Bangladesh Petroleum Exploration and Production Company (BAPEX) has made final preparations to bring under control a gas fire that has burned for 30 days from an abandoned tube well in Chhotakhal, Inani, Ukhiya, and to seal the hole permanently. It said it would start reducing the fire’s intensity in stages after the afternoon on Thursday. An early attempt to cap the flame that morning failed when it reignited seven minutes after starting.

BAPEX drilling superintendent Md Rakibul Hasan said the intensity would be reduced first. The crew would then use casing pipe, drilling pipe and a special chemical called Vendonix to control the fire completely. If that succeeds, the hole would be sealed permanently with cement.

He said the site might hold a full gas field, not just a pocket of gas. After the fire is controlled, a geological survey would cover Inani and several kilometres around it, taking about a year, and later tests would determine the likely structure and location of any reserves.

Water and then burning gas began to emerge from the abandoned tube well beside a rented house on October 27. It was first treated as a limited “pocket gas” and left to burn for about 15 days. When the fire did not go out, BAPEX experts began a fresh assessment and later planned to control it and seal the hole.

BAPEX officials hope the survey will give a clear picture of the area’s actual reserves, extent and potential, which could lead to the discovery of a new gas field in Inani.

spot_img

Related Articles